info@fmcable.com     +86-15152726626

Fongming Cable China Space Station's rail assembly and construction are in full swing

Views: 2348     Author: Site Editor     Publish Time: 2021-04-29      Origin: Site

At about 11 o'clock on April 29, 2021, the Long March 5B Yao-2 carrier rocket carrying the Tianhe core module of the China Space Station was ignited and lifted off at the Wenchang Space Launch Site in China. The Tianhe core module was successfully separated from the rocket and entered the scheduled orbit. The two wings of the solar panels were deployed smoothly and working normally, and the launch mission was a complete success. The success of this launch mission marked the full launch of the orbital assembly and construction of the Chinese space station, laying a solid foundation for subsequent key technology verification and the smooth implementation of the space station's assembly and construction.

Yangzhou Fongming Cable Factory, focusing on space science and technology, is a mica wire manufacturing expert by your side.


bba1cd11728b4710f76069fdae28a8f5fd0323a6